Maximum demand
Assess connected loads and balance phase demand.
Installation
Type
Living units
Connected current index
— A
Loads
| Group | Qty | Load | Ph | Demand |
|---|
Assessed per
AS/NZS 3000 App. C
Load group
Quantity / points
Connected load (each)
Unit
Phases
Phase leg
Power factor
Efficiency
×
Advanced
Phase voltage
Line voltage
Results
Review maximum demand and phase loading.
Detailed analysis Load groups, compliance, comparison and audit
AS/NZS 3000 App. C
Document
Record project details and calculation notes.
Notes
- Maximum demand assessed per AS/NZS 3000:2018 Appendix C (Tables C1 & C2).
- Per-phase distribution assumes a 3-phase R/W/B supply. Single-phase loads are auto-balanced onto the least-loaded leg unless pinned to a specific phase (R/W/B); verify the actual allocation on site.
- All implemented factors and load subtypes await independent source and amendment review. Group totals are a current index, not supply current or kVA.
References
- — awaiting inputs —
Report
Print / Save as PDF