Ampacities

Maximum demand

Assess connected loads and balance phase demand.

AS/NZS 3000 · App. C
Installation
Type
Living units
Connected current index
— A
Loads 0 items
GroupQtyLoadPhDemand
Assessed per AS/NZS 3000 App. C

Results

Review maximum demand and phase loading.

solved
Detailed analysis Load groups, compliance, comparison and audit
AS/NZS 3000 App. C

Document

Record project details and calculation notes.

Audit-ready sheet
Notes
  1. Maximum demand assessed per AS/NZS 3000:2018 Appendix C (Tables C1 & C2).
  2. Per-phase distribution assumes a 3-phase R/W/B supply. Single-phase loads are auto-balanced onto the least-loaded leg unless pinned to a specific phase (R/W/B); verify the actual allocation on site.
  3. All implemented factors and load subtypes await independent source and amendment review. Group totals are a current index, not supply current or kVA.
References
  • — awaiting inputs —
— · Rev A · — Report Print / Save as PDF A professional aid, not engineering judgement — you remain responsible for verifying every input and result against the standards that apply to your work.